Trbovlje Thermal Power Plant Transloading Station

Client/investor: Termoelektrarna Trbovlje, d.o.o.

Project category: Engineering and foreign markets

Project timeline: 2009 - 2010

Project status: The project has been completed

Brief introduction

The GH Holding company – as a partner in a consortium – signed an agreement in May of 2009 with the Trbovlje Thermal Power Plant for the implementation of the work within the scope of the TRBOVLJE Thermal Power Plant project.

Description of the project

Within the framework of the project, we have carried out construction work together with our partners and sub-contractors (piles for the foundations of the transloading station plateau, new building for the transloading of energy products and landscaping), the construction of track devices (laying of rails and switch points with associated elements) and signalling and safety equipment (external and internal) as well as the construction of the catenary. In addition to the above, we have supplied and installed devices for the horizontal unloading of wagons carrying fuel. These devices meet the stringent criteria for granulate unloading. We have also supplied and installed a multi-level transport system with command and control from a central location.

Photo gallery
  • © GH HOLDING, Letališka cesta 27, 1000 Ljubljana
  • t 08 2002 800